RENCANA ANGGARAN BIAYA (RAB)

RENCANA ANGGARAN BIAYA (RAB) 
PEMBANGUNAN MUSHOLLA “AL-IKHLAS”


NO
KETERANGAN
Vol
Sat
 Har Sat
 TOTAL






1
PEKERJAAN PENDAHULUAN




1
Pembersihan Lokasi
1
ls
200,000
200,000
2
Bowplank
1
ls
100,000
100,000
3
Pemasangan Listrik 450 watt
1
ls
1,500,000
1,500,000
4
Sumur + Pompa Air
1
ls
4,500,000
4,500,000
5
Air Kerja
1
ls
150,000
150,000
6
Listrik Kerja
1
ls
150,000
150,000

Sub. Total



6,600,000






2
PEKERJAAN GALIAN TANAH




1
Galian Tanah Pondasi Tiolet
4
m3
40,000
160,000
2
Galian Tanah Tapak Pondasi musholla
8
m3
40,000
320,000
3
Galian Septictank
4
m3
120,000
480,000
4
Galian Sanitasi
24
m2
10,000
240,000

Sub. Total



1,200,000






3
PEKERJAAN BANGUNAN MUSHOLLA




1
Pondasi Batu Kali
8
m3
120,000
960,000
2
Pondasi Bata
4000
buah
550
2,200,000
3
Batako
1200
buah
2,000
2,400,000
4
Tanah Uruk
8
m3
90,000
720,000
5
Bambu
60
btg
15,000
900,000
6
Balok 8 x 12 (4 m)
12
btg
160,000
1,920,000
7
Balok 6x 12 (4 m)
12
btg
120,000
1,440,000
8
Kaso 4 x 6 (4 m)
50
btg
30,000
1,500,000
9
Reng 2 x 3 (4 m)
100
btg
6,000
600,000
10
Balok 12 x 12 (4 m)
2
btg
200,000
400,000
11
Besi 6 mm
30
btg
15,000
450,000
12
Besi 8 mm
20
btg
35,000
700,000
13
Besi 10 mm
12
btg
53,000
636,000
14
Kawat Bendrat
6
kg
10,000
60,000
15
Paku 7
5
kg
15,000
75,000
16
Paku 5
5
kg
15,000
75,000
17
Paku 10
5
kg
15,000
75,000
18
Paku 12
2
kg
15,000
30,000
19
Amplas
12
m
10,000
120,000
20
Cat Tembok
2
klg
125,000
250,000
21
Balok Plafon Baja Ringan
24
btg
27,000
648,000
22
Kasebot
12
lbr
65,000
780,000
23
Gipsum
25
buah
20,000
500,000
24
Plamir
40
kg
15,000
600,000
25
Cat Plafon (Putih)
1
klg
125,000
125,000
26
Rist Plang
24
btg
50,000
1,200,000
27
Keramik
36
m2
60,000
2,160,000
28
Ramin
50
btg
60,000
3,000,000
29
Pintu
2
buah
800,000
1,600,000
30
Cendela
4
buah
160,000
640,000
31
Ventilasi Loster
6
buah
20,000
120,000
32
Glass Box
8
buah
20,000
160,000
33
Genteng PRES
1000
buah
1,300
1,300,000
34
Nock MANTILI
70
buah
3,500
245,000
35
Cat Genteng
2
klg
120,000
240,000
36
Kubah
1
buah
2,000,000
2,000,000
37
Pasir
12
m3
200,000
2,400,000
38
Koral
3
m3
200,000
600,000
39
Semen
80
sak
57,000
4,560,000
40
Upah Kerja
1

7,000,000
7,000,000
41
Instalasi Listrik
1

600,000
600,000

Sub. Total



45,989,000






4
PEKERJAAN BANGUNAN TOILET DAN TEMPAT WUDHU




1
Batu Bata
1500
buah
550
825,000
2
Pasir
4
m3
200,000
800,000
3
Koral
1
m3
200,000
200,000
4
Tanah Uruk
2
m3
90,000
180,000
5
Semen
20
sak
57,000
1,140,000
6
Besi 6 mm
8
btng
15,000
120,000
7
Besi 8 mm
15
btng
35,000
525,000
8
Besi 10 mm
8
btng
53,000
424,000
9
Bendrat
2
kg
10,000
20,000
10
Pintu WC
1
lbr
250,000
250,000
11
Tandon (500 liter)
1
buah
800,000
800,000
12
Toilet Jongkok
1
buah
150,000
150,000
13
Bak Mandi
1
buah
275,000
275,000
14
Keramik Lantai Dalam (Impresso) 20×20 cm
3
m2
56,000
168,000
15
Keramik Tembok Dalam (Impresso) 20×25 cm
16
m2
56,000
896,000
16
Keramik Lantai Luar (KIA) 20×20 cm
6
m2
56,000
336,000
17
Glass Box
2
buah
20,000
40,000
18
Loster
1
buah
20,000
20,000
19
Cat Tembok Putih
1
Klg
125,000
125,000
20
Kran
3
buah
20,000
60,000
21
Stop Kran
1
buah
35,000
35,000
22
Pipa 1/2 inch
2
btng
20,000
40,000
23
Pipa Paralon 3/4 inch
4
btng
24,000
96,000
24
Pipa 4 inch
2
btg
90,000
180,000
25
Pipa 2 1/2 inch
2
btg
60,000
120,000
26
Sock Drat
8
buah
6,000
48,000
27
Keni
12
buah
4,000
48,000
28
Seal Tape
2
roll
10,000
20,000
29
Lem PVC
1
buah
15,000
15,000
30
Upah Kerja
1

2,240,000
2,240,000
31
Instalasi Listrik
1

200,000
200,000
32
Otomatis Tower Air
1

150,000
150,000

Sub. Total



10,546,000






5
LAIN-LAIN



2,500,000






Grand Total
66,835,000



                                                                             Sidorejo, 2 September 2015
Ketua,                                                                   Bendahara,



YUDI KURNIAWAN                                        TRI ARISMAYA